{"id":1376,"date":"2024-09-28T07:43:45","date_gmt":"2024-09-28T07:43:45","guid":{"rendered":"https:\/\/vnrdev.in\/HR_Mannual\/?page_id=1376"},"modified":"2024-09-30T08:56:53","modified_gmt":"2024-09-30T08:56:53","slug":"guidelines-on-detailed-approval-process","status":"publish","type":"page","link":"https:\/\/vnrdev.in\/HR_Mannual\/guidelines-on-detailed-approval-process\/","title":{"rendered":"Guidelines on Detailed Approval Process"},"content":{"rendered":"\n<h4 class=\"wp-block-heading has-text-align-center\">General Awareness Program on Expense Processing<\/h4>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<h5 class=\"wp-block-heading\"><strong>We are covering the detailed expenses&nbsp;approval process.<\/strong><\/h5>\n\n\n\n<p><strong>Step 1:<\/strong>&nbsp;Login to Xeasy &amp; go to the Approver tab, as displayed in the screenshot below. In the approver tab, under the &#8216;verify status&#8217; tab, all the verified claims get displayed. Only those claims can be approved, which have the status as &#8216;Verified&#8217;.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"922\" height=\"253\" src=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image.png\" alt=\"\" class=\"wp-image-1336\" srcset=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image.png 922w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-300x82.png 300w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-768x211.png 768w\" sizes=\"auto, (max-width: 922px) 100vw, 922px\" \/><\/figure>\n\n\n\n<p><strong>Step 2:&nbsp;<\/strong>Click on the &#8216;month&#8217; of the employee whose claim is to be approved. A detailed list of head &amp; date-wise expenses will open, as displayed below. The amount can be increased \/ reduced from the &#8216;approver amt&#8217; tab &amp; remarks need be added for any such change in the &#8216;approver amt&#8217; tab. After that, in the &#8216;action&#8217; tab, there is a box which needs to be clicked, after which the green box will open, which again needs to be clicked, for approving the expense. After&nbsp;<strong>both the boxes<\/strong>&nbsp;have been clicked, &#8216;Approved&#8217; status will reflect in the &#8220;Claim Sts&#8221; tab. After<strong>&nbsp;all<\/strong>&nbsp;the entries have been approved, the month needs to be clicked again for refreshing the changes.&nbsp;<\/p>\n\n\n\n<p><em><strong>Note:&nbsp;<\/strong>Once the changes are refreshed,&nbsp;<strong>&#8216;A&#8217;&nbsp;<\/strong>in green letters shall get displayed, which shall mean that the claim has been approved at the amount reflecting in the approver amount tab &amp; after that, the amount cannot be updated. Hence it is advised to refresh the page only after all amounts have been checked.&nbsp;<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"957\" height=\"453\" src=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-1.png\" alt=\"\" class=\"wp-image-1337\" srcset=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-1.png 957w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-1-300x142.png 300w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-1-768x364.png 768w\" sizes=\"auto, (max-width: 957px) 100vw, 957px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"957\" height=\"151\" src=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/unnamed-1.png\" alt=\"\" class=\"wp-image-1341\" srcset=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/unnamed-1.png 957w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/unnamed-1-300x47.png 300w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/unnamed-1-768x121.png 768w\" sizes=\"auto, (max-width: 957px) 100vw, 957px\" \/><\/figure>\n\n\n\n<p><strong>Step 3:&nbsp;<\/strong>After&nbsp;the changes are refreshed, the approved amount will reflect in the tab. Then the claim can be approved by clicking the &#8216;submit&#8217; button.&nbsp; <\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"925\" height=\"177\" src=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-2.png\" alt=\"\" class=\"wp-image-1338\" srcset=\"https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-2.png 925w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-2-300x57.png 300w, https:\/\/vnrdev.in\/HR_Mannual\/wp-content\/uploads\/2024\/09\/image-2-768x147.png 768w\" sizes=\"auto, (max-width: 925px) 100vw, 925px\" \/><\/figure>\n\n\n\n<p>In case any&nbsp;practical&nbsp;difficulty is faced in the process, please send a mail to &#8220;<strong><a href=\"mailto:query@vnrseeds.com\" target=\"_blank\" rel=\"noreferrer noopener\">query@vnrseeds.com<\/a><\/strong>&#8220;.&nbsp;&nbsp;<\/p>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>General Awareness Program on Expense Processing We are covering the detailed expenses&nbsp;approval process. Step 1:&nbsp;Login to Xeasy &amp; go to the Approver tab, as displayed in the screenshot below. In the approver tab, under the &#8216;verify status&#8217; tab, all the verified claims get displayed. Only those claims can be approved, which have the status as [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"templates\/template-full-width.php","meta":{"footnotes":""},"class_list":["post-1376","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/pages\/1376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/comments?post=1376"}],"version-history":[{"count":7,"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/pages\/1376\/revisions"}],"predecessor-version":[{"id":1461,"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/pages\/1376\/revisions\/1461"}],"wp:attachment":[{"href":"https:\/\/vnrdev.in\/HR_Mannual\/wp-json\/wp\/v2\/media?parent=1376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}